To discuss your project call or email us
Phone Icon email Icon
Mobile Menu Open

PROJECTS & NEWS

Here at Evergrip, we provide a range of GRP products for safe access, plus all the insight and support needed to complete your project.  See some of our exciting projects below.

GRP Mammal Ledges

In partnership with the Staffordshire Alliance, our GRP mammal ledges are part of the West Coast Mainline upgrade.

Whitby Bridge

A package of renewal, renovation works for end of life wooden structures and surfaces using GRP gratings and hand rails.

University Student Village

Anti Slip & Tactile Paving Installed at the University Student Village Sports Pitch, West Midlands. Provision of safe surface coverings for all weather public access

Meadowhall Shopping Centre

In partnership with Laing O’Rourke, our rooftop GRP service raceway structure provides an innovative, tailored solution with minimised imposed load.

GRP Service Covers

Our GRP Grating with a solid top provides lightweight and salt-water resistant service covers at an exclusive yachting marina.

Cook Street Bridge

Water tight GRP bridge walkway, with removable access covers for maintenance.

Platform Gates and Fences by Evergrip

Secure GRP Gates & Fencing restricting access to track.

End of Platform Stairs by Evergrip

A long lasting, maintenance free solution with a nil scrap value.

Embankment Staircases

GRP embankment staircases for access. Fast installation for minimal downtime.

Yorkshire Schools

Working with Laing O’Rourke, providing, fabricating and installing GRP access and privacy products.

Five Reasons To Use GRP

Here are our top five reasons to use GRP as an alternative to other widely available supplies.

GRP Service Risers

Working in partnership with Mace, our premium service risers are now installed in the new Qatar Airways UK head office.

Our work with Investors in the Environment

We’re extremely pleased to announce we have joined Investors in the Environment and we are working towards their Green Accreditation.

Scarborough Spa Footbridge

In partnership with Jacobs Engineering & Wilf Noble Civil Engineering

Shipley Station

Light-weight GRP Everdeck Panels used to extend platform.

GRP In-fill Panels For A Pedestrian Bridge

Evergrip were tasked to carry out a refurbishment of a pedestrian bridge above a trunk road, Yorkshire.

Composite Ballast Panels & Handrail at a Railway Bridge

Evergrip engineered & fabricated a fibreglass composite structure incorporating fully GRP ballast panels & integral hand rail, to form a railway bridge parapet.

Blister Platform Edge Off Street Tactile Paving & GRP Anti-slip At Railway Station Platform

Evergrip supplied & fitted of GRP Anti-slip walkway surfacing & required platform edge warning tactile paving strip for partially sighted persons.

GRP Maintenance Access Platform At Railway Traction Depot

Provision of a maintenance access platform for train cleaning crews at Railway Traction Depot in South Wales.

Moulded Grating Walkway on Factory Roof

Evergrip supplied & fitted a raised GRP Moulded grating walkway with Anti-slip surface supported on a polypropylene screwjack pedestal system on a factory roof. 

Anti-slip In Tractor Manufacturing Plant

Provision of an even, designated, non slip surface for personnel at a Tractor Manufacturing Plant in Yorkshire.

Anti-slip Grating in Water Treatment Works

Provision of designated routes with non-slip surface for personnel across the Elvington WWTW Yorkshire. 

WOULD YOU LIKE TO START A PROJECT WITH US?
CALL OUR TEAM ON 01757 212744

Evergrip Limited

Flaxley Road, Selby, North Yorkshire
YO8 4BG United Kingdom

PHONE: 01757 212744
EMAIL: [email protected]
Company Registered Number: 04186772
Registered for VAT Number: GB 773 5346 10

Terms & Conditions
Privacy Notice

Fibreglass can blend in! Stockeld shoot bridge after 4 years service.
#stockeldpark

Load More...
CONTACT US
Register for our mailing list
Twitter Logo LinkedIn Logo Youtube Logo

27th March 2020

We are open for business

Covid 19 - Confirmation Statement

We would like to reassure all customers and enquirers that we remain open for business, while carefully following Government guidelines issued here:

https://www.gov.uk/coronavirus

The majority of our administration staff are working remotely and we have rostered production staff to make numbers available to meet demand.

We are able to provide the full range of our standard products from stock to serve any ongoing requirements you may have and will be pleased to receive any invitations to quote for future projects.

At the present time, in accordance with social distancing regulations we will not be conducting face to face meetings with business partners until further notice. However it may be possible to arrange video link meetings if required, please contact us for further information.

Collections of orders from our workshops are possible, by prior arrangement only please and visitors are reminded to observe the standard 2m distancing rules, for the safety of all. Unfortunately our welfare facilities will not be available to visitors at the present time.

Our transport partners are all providing us with a normal service.

We will update this statement if required and following any further guidance issued by the UK Government.

We wish you well.