To discuss your project call or email us
Phone Icon email Icon
Mobile Menu Open

Moulded Grating Walkway on Factory Roof

Evergrip supplied & fitted a raised GRP Moulded grating walkway with Anti-slip surface supported on a polypropylene screwjack pedestal system on a factory roof. 

Application

Supply & fit a raised GRP Moulded grating walkway with Anti-slip surface supported on a polypropylene screwjack pedestal system

Sector

Food & Beverages - Manufacturing Plant

Product Types

GRP Moulded Grating Open Mesh Gritted

Summary

We were asked by the client to supply and fit a section of Anti-slip raised walkway on a roof carrying water for use as an evaporative cooling system for the offices below.  This structure allows for maintenance operatives to access all parts of the rooftop facilities without walking through standing water.

Comprehensive measurements were taken and the walkway was cut to size and pre-assembled off site in our factory. Fibreglass Grating panels with a gritted top surface were used and supported in position using a raised pedestal system.

The use of GRP & polypropylene materials ensures a long maintenance free life with associated low life cycle cost.  Installation was carried out over two days.

CONTACT US BELOW
Phone IconCALL OUR TEAM ON 01757 212744

Evergrip Limited

Flaxley Road, Selby, North Yorkshire
YO8 4BG United Kingdom

PHONE: 01757 212744
EMAIL: info@evergrip.com
Company Registered Number: 04186772
Registered for VAT Number: GB 773 5346 10

Terms & Conditions
Privacy Notice

Twitter feed is not available at the moment.
CONTACT US
Twitter Logo LinkedIn Logo Youtube Logo

27th March 2020

We are open for business

Covid 19 - Confirmation Statement

We would like to reassure all customers and enquirers that we remain open for business, while carefully following Government guidelines issued here:

https://www.gov.uk/coronavirus

The majority of our administration staff are working remotely and we have rostered production staff to make numbers available to meet demand.

We are able to provide the full range of our standard products from stock to serve any ongoing requirements you may have and will be pleased to receive any invitations to quote for future projects.

At the present time, in accordance with social distancing regulations we will not be conducting face to face meetings with business partners until further notice. However it may be possible to arrange video link meetings if required, please contact us for further information.

Collections of orders from our workshops are possible, by prior arrangement only please and visitors are reminded to observe the standard 2m distancing rules, for the safety of all.

Our transport partners are all providing us with a normal service.

We will update this statement if required and following any further guidance issued by the UK Government.

We wish you well.