To discuss your project call or email us
Phone Icon email Icon
Mobile Menu Open

GRP moulded grating walkway

Providing a new walking surface for the historic Addingham Suspension Bridge in Yorkshire.

Application

Supply and fit a new GRP moulded grating deck to replace end of life wooden boards. Image credit: Paul Glazzard

Sector

Infrastructure - pedestrian bridges

Product Types

GRP Moulded Grating - covered & gritted

Maintenance-free panel system

Waterproof membrane

Manufactured and fitted by Evergrip

Fitting the walkway for Addingham Suspension Bridge

Summary

West Hall suspension bridge spans the river Wharfe near Addingham, Yorkshire. Here, the requirement from the controlling County Council was to fabricate and supply a new bridge deck comprising of fibreglass solid top grating panels with internal fixings. The old surface of wooden boards had reached end of life and were rotting. Their replacement was therefore vital.

The GRP materials used provided an ideal replacement; strong, yet light in weight and virtually maintenance free. Prepared first in our factory, the panel system was shipped to the site for installation. The old panels were stripped back, a waterproof membrane was fixed to the timbers and finally the new deck was laid.

For further details of this project, please contact our team. You can call us on +44(0)1757 212744 or email info@evergrip.com.

 

CONTACT US BELOW
Phone IconCALL OUR TEAM ON 01757 212744

Evergrip Limited

Flaxley Road, Selby, North Yorkshire
YO8 4BG United Kingdom

PHONE: 01757 212744
EMAIL: info@evergrip.com
Company Registered Number: 04186772
Registered for VAT Number: GB 773 5346 10

Terms & Conditions
Privacy Notice

Twitter feed is not available at the moment.
CONTACT US
Twitter Logo LinkedIn Logo Youtube Logo

27th March 2020

We are open for business

Covid 19 - Confirmation Statement

We would like to reassure all customers and enquirers that we remain open for business, while carefully following Government guidelines issued here:

https://www.gov.uk/coronavirus

The majority of our administration staff are working remotely and we have rostered production staff to make numbers available to meet demand.

We are able to provide the full range of our standard products from stock to serve any ongoing requirements you may have and will be pleased to receive any invitations to quote for future projects.

At the present time, in accordance with social distancing regulations we will not be conducting face to face meetings with business partners until further notice. However it may be possible to arrange video link meetings if required, please contact us for further information.

Collections of orders from our workshops are possible, by prior arrangement only please and visitors are reminded to observe the standard 2m distancing rules, for the safety of all.

Our transport partners are all providing us with a normal service.

We will update this statement if required and following any further guidance issued by the UK Government.

We wish you well.